Micro Balance
Room 1050; Protein Structure Core Facility
- Dust balance as necessary.
- Wipe down marble table with water as necessary
- Brush out inside floor of balance as necessary.
- Calibrate every 6 years (Next due in November 2017)
- Contact information:
Laurey Steinke DRC 1047 9-5176
Michele Fontaine DRC 1050 9-6647
Updated 11-06-2014 LS